Take and Modify from the 3D Warehouse

Learn how to take and existing model from the 3D warehouse and make it into your own.

1
Download and insert the model from the 3D Warehouse
4 mins
2
Place the Toilet into the Room
4 mins
3
Modify the Shower Door by Stretching and Moving it
6 mins
4
Add the Shower Tile and Textures
4 mins
5
Position the Texture of the Shower Floor Tile
3 mins
6
Create the Bathroom Floor Tile Pattern
4 mins
7
Create the Half Wall / Privacy Wall
2 mins
8
Stretch and Modify the Vanity Component
5 mins
9
Add the 2nd Sink and Vanity
5 mins
10
Create the Chair Rail Wall Break
2 mins
11
Use Follow me to Create the Chair Rail
5 mins
12
Expand the Mirror Component
3 mins
13
Add Detail Within the Half Wall
3 mins
14
Create the Shelving Unit
6 mins
15
Add the Final Details
4 mins

Be the first to add a review.

Please, login to leave a review
Add to Wishlist
Enrolled: 12 students
Duration: 1 hour
Lectures: 15